Articles In All Categories
-
2010
- Empennage has arrived ! 20/12/2010 (1. Horizontal Stabilo) 2010-12-16
- Spar reinforcement bars 28/12/2010 - 3,5h (1. Horizontal Stabilo) 2010-12-28
- Matchdrilling spars 29/12/2010 - 8h10m (1. Horizontal Stabilo) 2010-12-29
- Front spar assembly 30/12/2010 - 8h (1. Horizontal Stabilo) 2010-12-30
- HS702 work 31/12/2010 - 4h (1. Horizontal Stabilo) 2010-12-31
-
2011
- Rib preparation - 02/01/2011- 8h15 (1. Horizontal Stabilo) 2011-01-02
- Assemblage left stabilo 03/01/2011 - 07h45 (1. Horizontal Stabilo) 2011-01-03
- Assemblage right side stabilo 04/01/2011 - 7h (1. Horizontal Stabilo) 2011-01-04
- Deburring Right Horiz Stabilo 05/01/2011 - 1h30 (1. Horizontal Stabilo) 2011-01-05
- Deburr Right skin - 5/1/2011 - 1h (1. Horizontal Stabilo) 2011-01-07
- Dimple right skin - 08/01/2011 - 3h (1. Horizontal Stabilo) 2011-01-08
- Left skin preparation - 09/01/2011 - 3h (1. Horizontal Stabilo) 2011-01-09
- Spray Paint Training Visit - 12/01/2011 (1. Horizontal Stabilo) 2011-01-13
- Abrading parts - 13/01/2011 - 2h30 (1. Horizontal Stabilo) 2011-01-13
- Priming Horiz Stab - 15/01/2011 - 3h (1. Horizontal Stabilo) 2011-01-15
- Rivetting it together - 16/01/2011 - 7h15 (1. Horizontal Stabilo) 2011-01-17
- Rivetting - 21/01/2011 - 8h15 (1. Horizontal Stabilo) 2011-01-22
- Finishing the horizontal stabilo (1. Horizontal Stabilo) 2011-01-23
- Edge preparing - 27/01/2011 - 3h (2. Vertical Stabilo) 2011-01-27
- Matchdrilling - 29/01/2011 - 7h10 (2. Vertical Stabilo) 2011-01-29
- Priming - 30/01/2011 - 6h (2. Vertical Stabilo) 2011-01-30
- Fred came by with his fantastic pneumatic squeezer. - 04/02/2011 - 3h (2. Vertical Stabilo) 2011-02-04
- Rivetting vertical stabilisor - 5/2/2011 - 7h (2. Vertical Stabilo) 2011-02-05
- Rudder work - 12/02/2011 - 6h (3. Rudder) 2011-02-12
- Rudder horn - 13/02/2011 -3h (3. Rudder) 2011-02-13
- Deburring - 15/02/2011 - 1h (3. Rudder) 2011-02-16
- Dimpling 22/02/2011 - 5h30m (3. Rudder) 2011-02-20
- Edge Prep an priming preparation - 26/02/2011 - 6h (3. Rudder) 2011-02-27
- Priming - 27/02/2011 - 3h (3. Rudder) 2011-02-27
- Backrivetting - 1/3/2011 - 1h (3. Rudder) 2011-03-01
- Rudder work - 5/3/2011 - 4h (3. Rudder) 2011-03-06
- rudder rivetting - 6/3/2011 - 3h30 (3. Rudder) 2011-03-06
- Elevator stiffeners - 6/3/2011 - 2h (4. Elevators) 2011-03-06
- some repairs - 10/03/11 (3. Rudder) 2011-03-10
- Matchdrill left elevator stiff - 10/3/2011 - 3h (4. Elevators) 2011-03-12
- Deburr left elev - 13/11/2011 - 4h (4. Elevators) 2011-03-13
- DimplingE615PP - 15/03/2011 - 1h (4. Elevators) 2011-03-15
- Finalize left and right skin - 20/03/2011 - 4h (4. Elevators) 2011-03-21
- Priming prep - 25/03/2011 - 1h30 (4. Elevators) 2011-03-25
- Priming - 26/03/2011 - 4h (4. Elevators) 2011-03-28
- Backrivetting - 28/03/2011 - 1h30 (4. Elevators) 2011-03-29
- Rivetting - 30/03/2011 - 2h (4. Elevators) 2011-04-01
- Bending - 7/4/2011 - 3h30 (4. Elevators) 2011-04-09
- Matchdrill right elevator - 09/04/2011 - 8h30 (4. Elevators) 2011-04-10
- Matchdrill Left elevator - 15/04/2011 - 11.5h (4. Elevators) 2011-04-18
- Bending Hell - 30/04/2011 - 11h (4. Elevators) 2011-05-01
- Rework and prime - 07/05/2011 - 11h (4. Elevators) 2011-05-07
- Rivetting Right Elevator - 08/05/2011 - 6h30 (4. Elevators) 2011-05-08
- Fix + rivet left elevator 1 - 10/05/2011 - 2h (4. Elevators) 2011-05-10
- Left elevator rivetting - 14/5/2011 - 5h (4. Elevators) 2011-06-21
- Arrival - 26/08/2011 - 7h (1. Intro) 2011-06-24
- Wing Jig - 3/7/2011 - 6h45 (2. Jigs) 2011-07-03
- Trim tab - 5/8/2011 - 1h45 (4. Elevators) 2011-08-12
- Wing jig completed - 14/8/201 - 4h (2. Jigs) 2011-08-15
- Elevator Trim Attaching - 15/8/2011 - 6h (4. Elevators) 2011-08-17
- Empenage Inspection - 18/08/2011 - 4h (5. Inspection) 2011-08-19
- Finishing VS - 18/08/2011 (2. Vertical Stabilo) 2011-08-19
- Finishing HS - 21/08/2011 - 2h (1. Horizontal Stabilo) 2011-08-22
- Rolling Leading Edges - 21/08/2011 - 10h (4. Elevators) 2011-08-22
- Finish elevators - 23/08/2011 - 4h (4. Elevators) 2011-08-24
- Pro Seal hell - 25/08/2011 - 2h (3. Rudder) 2011-08-25
- Rudder finishing - 25/08/2011 - 5h (3. Rudder) 2011-08-29
- Removing some skin - 25/8/2011 - 1h (1. Horizontal Stabilo) 2011-08-29
- Empennage finished shot - 25/8/2011 (5. Inspection) 2011-08-29
- Main spar tank nutplates - 03/09/2011 (3. Main Spar) 2011-09-06
- Tie down rings - 10/09/2011 (3. Main Spar) 2011-10-02
- Rear Spar work - 24/09/2011 - 12h (3. Main Spar) 2011-10-02
- Wing Ribs Left Wing - 08/10/2011 - Tot 19h30 (4. Main Wings) 2011-10-17
- Wings Ribs Right Wing - 31/10/2011 - 19h (4. Main Wings) 2011-10-31
- Right wing ribs complete - 01/11/2011 - 5h (4. Main Wings) 2011-11-01
- Matchdrill Skeleton Wings - 05/11/2011 - 11h (4. Main Wings) 2011-11-05
- WingDoubler & wiring holes - 5/11/2011 - 7h30 (4. Main Wings) 2011-11-09
- Scuffing parts - 21/11/2011 - 10h (4. Main Wings) 2011-11-21
- DAMN DAMN DAMN ! - 23-11/2011 - 2h (4. Main Wings) 2011-11-24
- Priming Ribs - 25/11/2011 - 6h (4. Main Wings) 2011-11-25
- Rivetting the right wing skeleton - 26/11/2011 - 9h (4. Main Wings) 2011-11-27
- Match drilling right wing skins - 4/12/2011 - 9h (4. Main Wings) 2011-12-06
- Leading Edge Cradle - 09/12/2011 - 2h (2. Jigs) 2011-12-09
- Left wing skeleton work - 10/12/2011 - 7h (4. Main Wings) 2011-12-10
- Matchdrill left wing - 18/11/2011 - 4h (4. Main Wings) 2011-12-19
- Leading edge right wing - 23/12/2011 - 6h (4. Main Wings) 2011-12-25
- Drill and install joint place W423 - 25/12/2011 - 3h (4. Main Wings) 2011-12-25
- Leading Edge Left Wing - 28/12/2011 - 4h50 (4. Main Wings) 2011-12-28
-
2012
- Matchdrill complete - 31/12/2011 - 2h (4. Main Wings) 2012-01-02
- Devynil-deburr - 3/1/2012 - 2h (4. Main Wings) 2012-01-03
- Z-Brackets preparation - 05/01/2012 - 1h (5. Fuel Tanks) 2012-01-05
- Z-Brackets drilling - 7/1/2011 - 3h (5. Fuel Tanks) 2012-01-12
- Stiffeners left wing - 16/01/2012 - 5h (5. Fuel Tanks) 2012-01-17
- Fuel tank cleco - 22/01/2012 - 6h (5. Fuel Tanks) 2012-01-23
- Right Tank Preparation - 27/01/2012 - 8h (5. Fuel Tanks) 2012-01-27
- Checkoway work - 28/01/2012 - 4h (5. Fuel Tanks) 2012-01-30
- Deburr and Dimple - 07/02/2012 - 4h (5. Fuel Tanks) 2012-02-08
- Dimpling and Drain LT - 09/02/2012 - 2h (5. Fuel Tanks) 2012-02-09
- Final Tank Prep Work - 11/02/2012 - 9h (5. Fuel Tanks) 2012-02-11
- Misc Tank work - 14/02/2012 - 12h (5. Fuel Tanks) 2012-02-15
- Right tank prep - 18/2/2012 - 8h (5. Fuel Tanks) 2012-02-19
- Cont right tank prep - 22/02/2012 - 3h (5. Fuel Tanks) 2012-02-23
- The proseal game is on - 25/02/2012 - 8:30 (5. Fuel Tanks) 2012-02-26
- More fuel tank rivetting - 3/3/2012 - 15h (5. Fuel Tanks) 2012-03-06
- Fuel Tank Sealing - 25/03/2012 - 10h (5. Fuel Tanks) 2012-04-09
- Right tank sealing - 21/04/2012 - 9h45 (5. Fuel Tanks) 2012-04-25
- Right wing tank work - 29/04/2012 - 16h (5. Fuel Tanks) 2012-05-02
- Preparing for tank closing - 15/5/2012 - 6:30 (5. Fuel Tanks) 2012-05-17
- Preparation Leading edges - 18/5/2012 - 9h30 (4. Main Wings) 2012-05-19
- Left Main skin dimpling - 19/05/2012 - 7h40 (4. Main Wings) 2012-05-19
- OO-156 flying (4. Main Wings) 2012-05-29
- Main Spar work - 30/05/2012 - 9h30 (3. Main Spar) 2012-06-01
- Fuel sender access port - 02/06/2012 (5. Fuel Tanks) 2012-06-05
- Closing the tanks - 03/06/2012 (5. Fuel Tanks) 2012-06-05
- Closing access plates - 10/6/2012 - 4h (5. Fuel Tanks) 2012-06-14
- Stall warner matchdrilling - 12/06/2012 - 9h (4. Main Wings) 2012-06-17
- Pitot mast drill hole - 17/6/2012 - 6h30 (4. Main Wings) 2012-06-24
- Install Stall Warner access plate - 21/06/2012 - 3h (4. Main Wings) 2012-06-26
- Catch up work - 24/06/2012 - 7h (4. Main Wings) 2012-06-26
- Rivetting Leading Edges - 01/07/2012 - 6h00 (4. Main Wings) 2012-07-06
- Stall warner assembly - 3/7/2012 -1h (4. Main Wings) 2012-07-09
- Rivetting leading edge to spar - 11/7/2012 - 8h45 (4. Main Wings) 2012-07-10
- Rivetting aft line leading edge to spar - 12/07/2012 - 5h30 (4. Main Wings) 2012-07-12
- Priming the skins - 20/7/2012 - 6h30 (4. Main Wings) 2012-07-21
- Tank wrap-up - 21/07/2012 - 5h (5. Fuel Tanks) 2012-07-24
- Final measurements - 22/07/2012 - 4h (4. Main Wings) 2012-07-25
- Rivet Left wing top skin - 23/07/2012 - 06h15 (4. Main Wings) 2012-07-26
- Finish Left Top skins and Right Top Skins - 30/07/2012 (4. Main Wings) 2012-08-07
- Fuel tank leak test - 3/9/2012 (5. Fuel Tanks) 2012-09-05
- Right tank fuel leak test - 9/9/2012 (5. Fuel Tanks) 2012-09-11
- Aileron fairings - 13/09/2012 (4. Main Wings) 2012-09-14
- Cutting stiffeners - 11/09/2012 - 2h (6. Ailerons) 2012-09-14
- Inspection access doors - 15/09/2012 - 9h (4. Main Wings) 2012-09-24
- Building the wing cradle - 02/09/2012 - 6h (2. Jigs) 2012-09-26
- Aileron prep work - 22/09/2012 - 10h (6. Ailerons) 2012-09-28
- Aileron bending and matchdrilling - 07/10/2012 - 8h (6. Ailerons) 2012-10-08
- aileron assembly - 14/10/2012 (6. Ailerons) 2012-10-26
- Finishing ailerons - 30/10/2012 - 7h (6. Ailerons) 2012-10-31
- Aileron and flap braces - 05/11/2012 - 3h30 (4. Main Wings) 2012-11-07
- Flaps Matchdrilling - 12/11/2012 - 12h (7. Flaps) 2012-11-16
- Flap Rivetting - 01/12/2012 - 16h (7. Flaps) 2012-12-06
- Left Flap To Wing - 15/12/12 - 5h (7. Flaps) 2012-12-21
- aileron pushrods - 18/12/2012 - 5h (6. Ailerons) 2012-12-22
- Pitot Mast work - 21/12/2012 - 2h (4. Main Wings) 2012-12-27
- Right Flap 2 Wing - 22/12/2012 - 7h30 (7. Flaps) 2012-12-28
- Various remaining jobs - 24/12/2012 - 3:30 (6. Ailerons) 2012-12-30
- Wings are done ! - 24/12/2012 Inspected and approved by DGLV - 10/12/2018 (Wing) 2012-12-30
-
2013
- Firewall work - 25/12/2012 - 9h (1. Firewall) 2013-01-01
- More firewall work - 28/12/2012 (1. Firewall) 2013-01-02
- 704 Center Bulkhead work - 12/30/2012 - 6h (2. F-704 bulkhead) 2013-01-02
- 704 matchdrilling - 12/31/2012 - 6h30 (2. F-704 bulkhead) 2013-01-02
- Rivetting - 3/jan/2012 - 6h30 (2. F-704 bulkhead) 2013-01-03
- F705 bulkhead work -12/01/2013 (3. F-705 bulkhead) 2013-01-18
- F705 drilling flapbrace - 26/01/2013 - 2h (3. F-705 bulkhead) 2013-01-31
- F706 Prep work - 27/01/2012 (4. F-706 bulkhead) 2013-02-13
- F707-F708 bulkhead prepping - 16/02/2013 (5. Tail bulkheads) 2013-03-11
- F711 - tail bulkheads - 2/3/2013 (5. Tail bulkheads) 2013-03-17
- F704 rivetting center section bar - 2/3/2013 (2. F-704 bulkhead) 2013-03-18
- F-712 matchdrilling - 03/03/2013 (5. Tail bulkheads) 2013-03-18
- F705 matchdrilling ruined part - 3/3/2013 (3. F-705 bulkhead) 2013-03-18
- Firewall Battery Box - 09/03/2013 (1. Firewall) 2013-03-21
- Firewall Accessories - 16/3/2013 (1. Firewall) 2013-03-22
- J-Channel preparations -23/03/2013 (5. Tail bulkheads) 2013-04-20
- Bending Longerons - 30/03/2013 (6. Longerons) 2013-04-26
- Bending Longerons 2 - 02/04/2013 (6. Longerons) 2013-04-26
- Bending Longerons 3 - 04/04/2013 (6. Longerons) 2013-05-08
- Drilling aft canopy deck - 05/04/2013 (6. Longerons) 2013-05-11
- Cutting tail skin for wheel fork - 20/04/2013 (5. Tail bulkheads) 2013-05-11
- Prime Time - 25/4/2013 (3. F-705 bulkhead) 2013-05-12
- F705 rivetting session 1 - 5/5/2013 (3. F-705 bulkhead) 2013-05-13
- F704 Center Section Bulkhead Rivetting - 12/05/2013 (2. F-704 bulkhead) 2013-05-15
- Firewall rivetting - 12/05/2013 (1. Firewall) 2013-05-17
- Finish Firewall Rivetting - 17/05/2013 (1. Firewall) 2013-06-03
- Tail bulkhead rivetting - 22/05/13 (5. Tail bulkheads) 2013-06-21
- Tail bulkhead rivetting 2 - 15/08/13 (5. Tail bulkheads) 2013-08-26
- WD409 tailwheel welding drilled - 03/09/2013 (7. Tail Assembly) 2013-09-04
- Aft fuselage cleco - 07/09/2013 (7. Tail Assembly) 2013-09-09
- Aft fuselage drilling - 9/9/2013 (7. Tail Assembly) 2013-09-10
- Aft fuselage matchdrilling - 14/09/2013 (7. Tail Assembly) 2013-09-23
- Dimpling aft fuselage - 29/09/2013 (7. Tail Assembly) 2013-10-04
- Problem fixing - 05/10/2013 (7. Tail Assembly) 2013-10-11
- Aft fuselage rivetting - 02/11/2013 (7. Tail Assembly) 2013-11-13
- Finishing aft fuselage work - 16/11/2013 (7. Tail Assembly) 2013-12-09
- Rib prep, deburr and making pieces - 07/12/2013 (8. Center Fuselage) 2013-12-09
- Some spacers and preparation of ribs - 12/12/2013 (8. Center Fuselage) 2013-12-16
- F-623 ribs and Matchdrilling center fuselage - 15/12/2013 (8. Center Fuselage) 2013-12-16
- Drilling the F623L and R corner ribs - 21/12/2013 (8. Center Fuselage) 2013-12-23
- Matchdrilling the F704 - 22/12/2013 (8. Center Fuselage) 2013-12-23
-
2014
- Crotch seatbelt kit and more drilling - 28/12/2013 (8. Center Fuselage) 2014-01-06
- Priming center fuselage parts - 03/05/2014 (8. Center Fuselage) 2014-05-05
- Center fuselage rivetting - 10/05/2014 (8. Center Fuselage) 2014-05-12
- Center fuselage rivettingskin 9/6/2014 (8. Center Fuselage) 2014-06-12
- Rivetting skin and deburr seat skins - 29/07/2014 (8. Center Fuselage) 2014-07-29
- Matchdrill seat skins and install F715 - 02/08/2014 (8. Center Fuselage) 2014-08-05
- Install passenger side F715 - 09/08/2014 (8. Center Fuselage) 2014-08-14
- Joining aft and center fuselage - 24/08/2014 (9. Forward and Center fuselage) 2014-08-25
- Prep and drill armrests - 27/08/2014 (9. Forward and Center fuselage) 2014-08-31
- Notching longerons - 16/08/2014 (6. Longerons) 2014-08-31
- F770 conical bends in side skin - 30/08/2014 (9. Forward and Center fuselage) 2014-09-01
- Matchdrill aft and center fuselage - 3/9/2014 (9. Forward and Center fuselage) 2014-09-05
- Drilling longerons - 05/09/2014 (9. Forward and Center fuselage) 2014-09-05
- Drilling Front longerons - 27/09/2014 (6. Longerons) 2014-10-08
- Drilling front longerons continued - 27/09/2014 (6. Longerons) 2014-10-14
- Drilling longerons and skin to WD-602 brackets. - 12/10/2014 (9. Forward and Center fuselage) 2014-11-05
- Drill Firewall to side and bottom skin - 04/10/2014 (9. Forward and Center fuselage) 2015-01-06
-
2015
- F-684 Gusset work - 29/12/2014 (9. Forward and Center fuselage) 2015-01-06
- Making F-796 parts - 02/01/2015 (9. Forward and Center fuselage) 2015-01-07
- F-902 bulkheads - 31/12/2014 (9. Forward and Center fuselage) 2015-01-16
- Redo F713 aux longerons and F7101 gear attach web - 11/03/2015 (9. Forward and Center fuselage) 2015-03-12
- Remade F-684 gussets - 04/01/2015 (9. Forward and Center fuselage) 2015-03-19
- Starting work on rudder pedals - 09/01/2015 (9. Forward and Center fuselage) 2015-03-19
- Lower and aux longeron drilling - 14/03/2015 (9. Forward and Center fuselage) 2016-08-09
-
2016
- 25-06-2016 Deburring angles forward fuselage (9. Forward and Center fuselage) 2016-06-28
- 18/07/2016 drilling nutplates for vent line - 1h (9. Forward and Center fuselage) 2016-07-20
- 19/07/2016 countersinking floor stiffeners - 3h (9. Forward and Center fuselage) 2016-07-20
- 09/08/2016 Countersinking cntd... - 2h (9. Forward and Center fuselage) 2016-08-09
- 11/08/2016 - deburring side skins - 2h (9. Forward and Center fuselage) 2016-08-12
- 15/08/2016 - deburr, dimple parts continued - 3.5h (9. Forward and Center fuselage) 2016-08-15
- 21/08/2015 Countersink Left longeron, F704H and various other parts (9. Forward and Center fuselage) 2016-08-22
- 28/08/2016 Countersink R longeron and dimple R tail skin - 4h (9. Forward and Center fuselage) 2016-08-29
- 01/09/2016 - Dimple/countersink/deburring continued... - 3.5h (9. Forward and Center fuselage) 2016-09-02
- 20/11/2016 - dimpling F772 forward bottom skin - 2h (9. Forward and Center fuselage) 2016-11-21
-
2017
- 07/02/2017 Dimpling some problematic holes in aft botom skin - 3h (9. Forward and Center fuselage) 2017-02-08
- 12/02/2017 countersinking F704A, side skins and continued assembly - 3h (9. Forward and Center fuselage) 2017-02-14
- 21/02/2017 Cutting fuel pass through in F7101 (9. Forward and Center fuselage) 2017-02-22
- 22/02/2017 Baggage area bulkheads and covers - 1.5h (8. Center Fuselage) 2017-02-23
- 23/02/2017 Countersink missing #30s on forward longeron - 1h (9. Forward and Center fuselage) 2017-02-24
- 24/02/2017 Drilling lightning holes in F-7101 - 1h (9. Forward and Center fuselage) 2017-02-28
- 25/02/2017- various tasks F715 seat rib drilling,trimming,making doubler - 5h (9. Forward and Center fuselage) 2017-03-01
- 26/02/2017 - Running conduit in baggage and seat area - 4h (9. Forward and Center fuselage) 2017-03-01
- 07/03/2017 Preparing paint booth, scuffing and more missed items - 3h (9. Forward and Center fuselage) 2017-03-09
- 11/03/2017 - Prime time ! - 5h (9. Forward and Center fuselage) 2017-03-14
- 21/03/2017 - More priming preperation and cutting - 4h (9. Forward and Center fuselage) 2017-03-22
- 25/03/2017- final priming fwd fuselage parts - 6h (9. Forward and Center fuselage) 2017-03-27
- 26/03/2017 - Rivetting started - 3h (9. Forward and Center fuselage) 2017-03-27
- 02/04/2017 - Rivetting firewall gusset and F704H - 3h (9. Forward and Center fuselage) 2017-04-05
- 06/04/2017 - Rudder pedals work - 6h (9. Forward and Center fuselage) 2017-04-10
- 07/04/2017 - Rudder pedal position drilling - 4h (9. Forward and Center fuselage) 2017-04-11
- 08/04/2017 - rudder pedal center brace - 4h (9. Forward and Center fuselage) 2017-04-13
- 15/04/2017 - Bolt installation on F-704 - 1.5H (9. Forward and Center fuselage) 2017-04-18
- 17/04/2017 - rivetting time - 5h (9. Forward and Center fuselage) 2017-04-18
- 18/04/2017 - more rivetting on forward fuselage 1 - 2h (9. Forward and Center fuselage) 2017-04-20
- 19/04/2017 - rivetting cntd. - 2h (9. Forward and Center fuselage) 2017-04-21
- 22/04/2017 - rivetting cntd 3 - 4h (9. Forward and Center fuselage) 2017-04-24
- 29/04/2017 - Sealing firewall - 4h (9. Forward and Center fuselage) 2017-05-04
- 03/05/2017 - rivetting cntd 4 bottom skin - 1.5h (9. Forward and Center fuselage) 2017-05-10
- 04/05/20178 - rivetting cntd 5 - 1h (9. Forward and Center fuselage) 2017-05-11
- 27/05/2017 - First cherrymax rivets - 1h (9. Forward and Center fuselage) 2017-05-30
- 27/05/2017 - ROLLING THE CANOE - 5h (9. Forward and Center fuselage) 2017-05-30
- 2/06/2017 - Making fuselage supports (9b. Top Fuselage) 2017-07-02
- 02/07/2017 - Matchdrilling the aft deck - 5h30 (9b. Top Fuselage) 2017-07-03
- 06/07/2017 - Canopy deck works - 2h (9b. Top Fuselage) 2017-07-10
- 07/07/2017 - canopy deck and firewall gussets 1 - 4h30 (9b. Top Fuselage) 2017-07-11
- 08/07/2017 - Engine mount bracket vs fuselage gusset and harnass - 4h30 (9b. Top Fuselage) 2017-07-18
- 14/07/2017 - Drill out engine mount brackets - 3h30 (9b. Top Fuselage) 2017-07-19
- 15/07/2017 - clips, forward canopydeck and other various small tasks - 6h (9b. Top Fuselage) 2018-06-14
-
2018
- 21/07/2017 - Stiffeners and aft top fuselage skin drilling. (9b. Top Fuselage) 2018-06-18
- 22/07/2017 - Matchdrilling aft top skin F7112. (9b. Top Fuselage) 2018-06-19
- 11/08/2017 - work on stiffener web and gusset plates (9b. Top Fuselage) 2018-06-21
- 13/08/2017 - deburring and dimpling top fuselage stuff. (9b. Top Fuselage) 2018-06-21
- 15/08/2017 - spacers and down elevator stop spacer. (9b. Top Fuselage) 2018-06-22
- 06/07/2018 - Priming top fuselage parts - 5h (9b. Top Fuselage) 2018-07-17
- 12/07/2018 - Rivetting F-656 gussets on longeron and bulkheads - 4h (9b. Top Fuselage) 2018-07-18
- 13/07/2018 - Static line bow construction and rivetting bellcrank - 3h (9b. Top Fuselage) 2018-07-23
- 15/07/2018 - Setting some missing rivets - 2h (9b. Top Fuselage) 2018-07-24
- 25/07/2018 - WD-409 tail spring mount issues - 2h (7. Tail Assembly) 2018-08-01
- 27/07/2018 - Rivetting aft deck - 3.5h (9b. Top Fuselage) 2018-08-01
- 28/07/2018 - Finishing F-714 aft deck - 1.5h (9b. Top Fuselage) 2018-08-02
- 28/07/2018 - F707B Angle clip and fitting to fuselage - 1h (9b. Top Fuselage) 2018-08-02
- 29/07/2018 - rivetting side rails and gussets-5h (8. Center Fuselage) 2018-08-07
- 04/08/2018 - F-6111 ribs - 4h (9b. Top Fuselage) 2018-08-07
- 08/08/2018 - Rudder cable reinstall - 1h (9. Forward and Center fuselage) 2018-08-21
- 10/08/2018 - Baggage compartment ELT and storage cut out - 9h (10. Baggage and seats area) 2018-08-21
- 11/08/2018- Second cut out in baggage floors - ? (10. Baggage and seats area) 2018-10-24
- 11/08/2018 - Baggage cover plate - 3h (10. Baggage and seats area) 2018-10-24
- 15/08/2018 - Upper baggage cover - 7h (10. Baggage and seats area) 2018-10-24
- 16/08/2018 - Upper baggage continued - 2h (10. Baggage and seats area) 2018-11-19
- 17/08/2018 - Nutplate holes upper baggage. - 1h (10. Baggage and seats area) 2018-11-19
- 18/08/2018 - Finishing baggage covers and seat belt wear blocks - 7h (10. Baggage and seats area) 2018-11-19
- 23/08/2018 - Drilling hinges to F-742 aft seat floors - 4.5h (10. Baggage and seats area) 2018-11-19
- 25/08/2018 - Tunnel cover - 7h (10. Baggage and seats area) 2018-11-27
- 06/10/2018 - tunnel cover continued - 7h (10. Baggage and seats area) 2018-11-27
- 29/11/2018 - Seat backs - 7h30 (10. Baggage and seats area) 2018-12-03
- 30/11/2018 - Seat backs (2) - 4h30 (10. Baggage and seats area) 2018-12-03
- 01/12/2018 - Redrill upper engine mounts to fuselage - 4H (1. Firewall) 2018-12-19
- 02/12/2018 - Center cabin cover - 7H30 (9. Forward and Center fuselage) 2018-12-21
- 03/12/2018 - Center cabin cover to floor angles - 3H (9. Forward and Center fuselage) 2018-12-21
- 06/12/2018 - Andair fuel tank selector - 2h (10. Baggage and seats area) 2018-12-29
-
2019
- 08/12/2018 - Starting F-7114 gussets - 3H (10. Baggage and seats area) 2019-01-07
- 09/12/2018 - Continue F-7114 gussets - 2H (10. Baggage and seats area) 2019-01-07
- 15/12/2018 - Forward covers fitting - 7H (9. Forward and Center fuselage) 2019-01-08
- 16/12/2018 - Flap motor fitting - 5H (9. Forward and Center fuselage) 2019-01-08
- 23/12/2018 - Flap motor work continued - 6H (9. Forward and Center fuselage) 2019-01-08
- 24/12/2018 - Flap motor work continued 3 - 3H (9. Forward and Center fuselage) 2019-01-09
- 26-29/12/2018 - Priming - 22H (9. Forward and Center fuselage) 2019-01-09
- 30/12/2018 - Rivetting bracke pedals - 5H (9. Forward and Center fuselage) 2019-01-09
- 31/12/2018 - Seatback rivetting - 7H (10. Baggage and seats area) 2019-01-10
- 02/01/2019 - Baggage compartment misc rivetting - 8H (10. Baggage and seats area) 2019-01-10
- 03/01/208 - Seat floor rivetting and flap motor - 9H (10. Baggage and seats area) 2019-01-11
- 04/01/2019 - Flap motor drilling - 3H (10. Baggage and seats area) 2019-01-14
- 05/01/2019 - F-7114 gusset positioning and heat baffles - 5H (9. Forward and Center fuselage) 2019-01-14
- 07/01/2019 - Center cover repair - 2H (9. Forward and Center fuselage) 2019-01-14
- 08/01/2019 - Finalizing fix of the center cabin cover crack - 1H (9. Forward and Center fuselage) 2019-01-15
- 11/01/2019 - Side caps F-704 - 4h30 (9. Forward and Center fuselage) 2019-01-15
- 12/01/2019 - Starting Fwd Top fuselage - 6h (9. Forward and Center fuselage) 2019-01-16
- 13/01/2019 - Start drilling FWD top fuselage - 1h40 (9. Forward and Center fuselage) 2019-01-16
- 20/01/2018 - Bending the firewall - 1h (1. Firewall) 2019-02-02
- 24/01/2019 - Welding engine mounts - 1h (1. Firewall) 2019-02-08
- 25/01/2019 - Drill canopy deck - 4H (9. Forward and Center fuselage) 2019-04-30
- 26/01/2019 - Matchdrill forward top fuselage - 9h30 (9. Forward and Center fuselage) 2019-04-30
- 23/03/2019 - Air vents installation - 10h (9. Forward and Center fuselage) 2019-05-04
- 30/03/2019 - Dimpling F-7106 top skin - 2h (9. Forward and Center fuselage) 2019-05-04
- 19/4/2019 - Fuel pump dog house - 2.5h (9. Forward and Center fuselage) 2019-05-06
- 20/4/2019 - priming day - 5h (9. Forward and Center fuselage) 2019-05-06
- 22/4/2019 - rivetting time on top fuselage - 4h (9. Forward and Center fuselage) 2019-05-08
- 26/04/2019 - Rivetting angles to top skin - 4h (9. Forward and Center fuselage) 2019-05-22
- 29/04/2019 - Rivetting left engine mount to firewall - 1H (1. Firewall) 2019-05-22
- 01/05/2019 - Miscellanious rivetting on fwd side - 4H (1. Firewall) 2019-05-22
- 04/05/2019 - Rivetting firewall gussets and vent line - 6h30 (9. Forward and Center fuselage) 2019-06-03
- 10/05/2019 - Finising kit arrived ! (1. Various Finishing) 2019-06-06
- 10/05/2019 - Passenger side vent line - 3h (9. Forward and Center fuselage) 2019-06-13
- 11/05/2019 - Finish kit inventory - 4h (1. Various Finishing) 2019-06-13
- 18/05/2019 - Drilling elevator horns VA-146 - 3H (11. Empennage mounting) 2019-06-13
- 07/06/2019 - Drilling elevator horns pushrod holes - 6h30 (11. Empennage mounting) 2019-06-18
- 08/06/2019 - Evaluating elevator horn drilling - 2h30 (11. Empennage mounting) 2019-07-03
- 29/06/2019 - Mounting the horizontal stabilo to the fuselage - 8h30 (11. Empennage mounting) 2019-07-03
- 06/07/19 - Cutting Vertical stabilo and first fit - 4h (11. Empennage mounting) 2019-08-07
- 13/07/2019 - Made the F-712D elevator stop - 4H (11. Empennage mounting) 2019-08-09
- 02/08/2019 - Drill elevator stop to fuselage - 4H (11. Empennage mounting) 2019-08-09
- 04/08/2019 - Mounting and drilling vertical stabilo - 6H (11. Empennage mounting) 2019-08-09
- 07/08/2019 - Drilling 3 remaining bolts bottom vertical stabilo - 2H (11. Empennage mounting) 2019-08-30
- 08/08/2019 - Some finishing pictures on empenage fitting - 1h (11. Empennage mounting) 2019-11-05
- 08/08/2019 - Some finishing pictures on empenage fitting - 1h (11. Empennage mounting) 2019-11-05
- 10/08/2019 - Rudder stops - 4h (11. Empennage mounting) 2019-11-05
- 14+15/8/2019 - Elevator pushrod assembly - 8h (11. Empennage mounting) 2019-12-02
- 23/8/2019 - rudder stops and pushrod fitting - 4h30 (11. Empennage mounting) 2019-12-02
- 31/08/2019 - RIvetting rudder stops and elevator stop install - 2h (11. Empennage mounting) 2019-12-04
- 01/09/2019 - Rivet vertical stab attach plate - 2h30 (11. Empennage mounting) 2019-12-04
- 04/11/2009 - Some unset rivetting work - 3H (9b. Top Fuselage) 2019-12-04
- 05/11/2019 - Start rivetting top skins - 3H (9b. Top Fuselage) 2019-12-05
- 06/11/2019 - Rivetting aft fuselage cont'd - 4H (9b. Top Fuselage) 2019-12-05
- 08/11/2019 - Rivet aft top skins cont'd - 3H (9b. Top Fuselage) 2019-12-05
- 10/11/2019 - Rivetting aft top fuselage cont'd - 8H (9b. Top Fuselage) 2019-12-05
- 28/11/2019 - Control column fitting - 4H (12. Systems) 2019-12-05
- 11/11/2019 - making static line clips - 2H (9b. Top Fuselage) 2019-12-05
- 12/11/2019 - static line connection - 1H (9b. Top Fuselage) 2019-12-05
- 15-23/11/2019 - painting the interior, sanding sanding and more sanding... - 45H (9. Forward and Center fuselage) 2019-12-05
- 27/11/2019 - Andair fuel tank selector - 1H (12. Systems) 2019-12-08
- 30/11/2019 - Fuel pump installation started - 5H (12. Systems) 2019-12-08
- 06/12/2019 - Service bulletin SB7-2-6 - 1h30 (12. Systems) 2019-12-19
- 07/12/2019 - control column installation - 5h (12. Systems) 2019-12-21
- 08/12/2019 - fuel pump mount work - 1h (12. Systems) 2019-12-27
-
2020
- 10/12/2019 - Damned ! Fucked up - 0h (12. Systems) 2020-02-06
- 24/12/2019 - cabin cover solving problems - 8H30 (12. Systems) 2020-02-06
- 30/12/2019 - Starting fuel lines - 2h30 (12. Systems) 2020-02-06
- 31/12/2019 - fuel lines (contnd) - 2h30 (12. Systems) 2020-02-07
- 02/01/2020 - fabricating gascolator brackets - 7h (12. Systems) 2020-02-07
- 06/01/2020 - Bent outer fuel line - 2H (12. Systems) 2020-02-08
- 18/01/2020 - Outer fuel lines (contnd) - 5h (12. Systems) 2020-02-08
- 12/02/20 - Naca vent installation - 6h (12. Systems) 2020-03-09
- 13/02/20 - prosealed naca vents and doghouse - 2H (12. Systems) 2020-03-09
- 16/02/2020 - Wing closing and inspection - 4.5H (8. Closing) 2020-03-09
- 20/02/2020 - right wing inner bottom skin - 6h (8. Closing) 2020-04-21
- 22+23/2/2020 - Rivetting right wing inner bottom skin - 5h (8. Closing) 2020-04-21
- 28/2/2020 - drill out inner aileron bracket - 2,5h (8. Closing) 2020-04-21
- 29/02/2020 - closing left wing inner skin and inspection - 5h30 (8. Closing) 2020-04-22
- 02/03/2020 - Pitot mast reinforcement - 2h (8. Closing) 2020-04-30
- 05/03/2020 - Pitot tubing work and some rivetting - 4h (8. Closing) 2020-04-30
- 07/03/2020 - Left wing inner bottom skin closing - 4h (8. Closing) 2020-04-30
- 15/03/2020 - engine mount drilling - 3H (2. Engine mount) 2020-04-30
- 18/04/2020 - Rivetting, pitot line and some touchup work - 3h (8. Closing) 2020-05-01
- 19/04/2020 - Pitot line support bracket - 3h30 (8. Closing) 2020-05-01
- 20/04/2020 - pitot line final and rivetting aileron hinge - 4h (8. Closing) 2020-05-01
- 21/04/2020 - rivetting bottom skin - 2h (8. Closing) 2020-05-04
- 22/04/2020 - Rivetting left wing outer bottom skin + small tasks - 4h (8. Closing) 2020-05-04
- 23/04/2020 - left wind outer skin rivetting (cntd) - 3h (8. Closing) 2020-08-18
- 25/04/2020 - rivetting left wing bottom skin final - 5h (8. Closing) 2020-08-18
- 28/04/2020 - flap brace rivetting and pitot mast - (8. Closing) 2020-08-18
- 01/05/2020 - Right aileron bracket - 2h (8. Closing) 2020-08-21
- 04/05/20020 - Right wing closing 1 - 3h (8. Closing) 2020-08-21
- 05/05/20020 - Right wing closing 2 - 3h (8. Closing) 2020-08-21
- 06/05/20020 - Right wing closing 3 - 3h (8. Closing) 2020-08-21
- 07/05/20020 - Right wing closing 4 - 1h (8. Closing) 2020-08-21
- 09/05/20020 - Right wing closing 4 - 2h (8. Closing) 2020-08-21
- 11/05/2020 - Measuring the terrace as apron parking space - 2h (9. Wing mating) 2020-08-21
- 12/05/2020 - Moving the plane out of the garage and attach wings - 5h (9. Wing mating) 2020-08-21
- 15/05/2020 - Mating wings, measure, measure and more measure - 8h (9. Wing mating) 2020-08-22
- 17/05/2020 - More measuring mating wings - 8h (9. Wing mating) 2020-08-24
- 19/05/2020 - Drilled the holes mating the wings - 10h (9. Wing mating) 2020-08-24
- 20/05/2020 - Bottom skin pairing and wing root fairing drilling - 5h (9. Wing mating) 2020-08-26
- 21/05/2020 - wing root fairing top side drilling - 5h (9. Wing mating) 2020-08-26
- 22/05/2020 - Adjusting flap gap with fuselage - 2h (9. Wing mating) 2020-08-27
- 23/05/2020 - aligned right aileron, start flap actuator hole - 4h (9. Wing mating) 2020-08-27
- 25/05/2020 - Fuel tank attach bracket - 5h15 (9. Wing mating) 2020-09-07
- 26/05/2020 - flap actuator hole, stick rigging - 7h30 (9. Wing mating) 2020-09-09
- 27/05/2020 - checking measurements and finalising flap holes - 3h (9. Wing mating) 2020-09-09
- 30/05/2020 - a visitor (9. Wing mating) 2020-11-16
- 02/06/2020 - bending fuel line - 4h (9. Wing mating) 2020-11-16
- 06/06/2020 - installing wing tips - 3h (6. Wing tips) 2020-11-16
- 13/06/2020 - Drilling right wing tip and starting left wing tip - 5h30 (6. Wing tips) 2020-11-17
- 02/07/2020 - Redrilling elevator horn after rewelding - 4h (11. Empennage mounting) 2020-11-17
- 04/07/2020 - Moving back inside - 5h (9. Wing mating) 2020-11-18
- 18/07/2020 - deburr/dimple/nutplates for wing fairings - 4h (4. Main Wings) 2020-11-19
- 20/07/2020 - More inner rib wingfairing work - 4h (4. Main Wings) 2020-11-21
- 25/07/2020 - Various tasks - 5h (4. Main Wings) 2020-11-21
- 29/07/2020 - marking and drilling access plates - 2h (1. Various Finishing) 2020-11-30
- 30/07/2020 - cutting access plate covers - 2h (1. Various Finishing) 2020-11-30
- 21/08/2020 - cleanup deburr the cover plates - 4H (1. Various Finishing) 2021-02-03
- 24/08/2020 - Bending and drilled pilot holes rollbar - 3h30 (3. Slider Canopy) 2021-02-03
-
2021
- 26/08/2020 - Roll bar - 1h (3. Slider Canopy) 2021-02-07
- 05/09/2020 - Making spacers for roll bar and drill rollbar - 5h (3. Slider Canopy) 2021-02-07
- 14/09/2020 - Finish drill roll bar - 3h (3. Slider Canopy) 2021-02-07
- 15/09/2020 - Cut and drill rails - 2h (3. Slider Canopy) 2021-02-07
- 17/09/2020 - Drill canopy slider block and frame - 2h (3. Slider Canopy) 2021-02-07
- 19/09/2020 - Slider rail and checking initial canopy fit - 2h (3. Slider Canopy) 2021-02-07
- 26/09/2020 - Bending canopy frame - 2h (3. Slider Canopy) 2021-02-08
- 21/10/2020 - More frame fitting, getting desperate - 8h (3. Slider Canopy) 2021-02-08
- 30/10/2020 - End of fitting, drill the sucker - 20H (3. Slider Canopy) 2021-02-08
- 03/11/2020 - Canopy centerline and latch hole - 4h (3. Slider Canopy) 2021-02-08
- 11/11/2020 - Initial canopy trimming - 6h (3. Slider Canopy) 2021-02-09
- 14/11/2020 - The Big Cut ! - 8h (3. Slider Canopy) 2021-02-09
- 15/11/2020 - Canopy trimming side and end - 6h (3. Slider Canopy) 2021-03-31
- 28/11/2020 - Frame bending compensation - 4h30 (3. Slider Canopy) 2021-03-31
- 27/01/2020 - Measuring to get roll bar level - 3h (3. Slider Canopy) 2021-03-31
- 28/01/2021 - cutting excess from roll bar feet - 2h15 (3. Slider Canopy) 2021-03-31
- 30/01/2021 - Roll bar support install - 5h30 (3. Slider Canopy) 2021-03-31
- 01/02/2021 - Reopening the rudder - 1h30 (3. Rudder) 2021-04-02
- 02/02/2021 - Reclosing top of rudder - 2h (3. Rudder) 2021-04-08
- 06/02/2021 - Install top rudder fairing - 3h (3. Rudder) 2021-04-08
- 20/02/2021 - Drill elevator fairings - 2h30 (4. Elevators) 2021-12-17
- 26/02/2021 - countersink elevator fairings - 1h (4. Elevators) 2021-12-17
- 03/04/2021 - Drilling canopy to canopy frame - 6h30 (3. Slider Canopy) 2021-12-17
- 05/04/2021 - canopy frame work - 7h45 (3. Slider Canopy) 2021-12-18
- 07/04/2021 - first windscreen impressions - 0h30 (3. Slider Canopy) 2021-12-18
- 01/05/2021 - measuring cut locations windscreen - 1h (3. Slider Canopy) 2021-12-18
- 13/08/2021 - cutting windscreen 1 - 2h (3. Slider Canopy) 2021-12-20
- 28/08/2021 - More cutting windscreen - 7h (3. Slider Canopy) 2021-12-21
- 04/09/2021 - More cutting on the windscreen - 6h (3. Slider Canopy) 2021-12-21
- 18/09/2021 - slider cut - 3h30 (3. Slider Canopy) 2021-12-21
- 22/09/2021 - windscreen cutting - 5h (3. Slider Canopy) 2021-12-21
- 23/09/2021 - drilling frame wheels to slider rail - 3h (3. Slider Canopy) 2021-12-22
- 29/09/2021 - Drilled the windscreen to the rollbar - 3h (3. Slider Canopy) 2021-12-22
- 01/10/2021 - contd drilling windscreen - 4h (3. Slider Canopy) 2021-12-23
- 02/10/2021 - some more tweaking - 4h (3. Slider Canopy) 2021-12-23
- 03/10/2021 - making windscreen attach clips - 2h30 (3. Slider Canopy) 2021-12-23
- 05/10/2021 - countersinking windscreen holes - 3h (3. Slider Canopy) 2021-12-23
- 06/10/2021 - tapping the roll bar - 3h (3. Slider Canopy) 2021-12-23
- 14/10/2021 - Canopy latch work - 3h (3. Slider Canopy) 2021-12-24
- 15/10/2021 - Canopy latch mechanism, part 2 - 2h (3. Slider Canopy) 2021-12-24
- 22/10/2021 - Rear canopy blocks - 4h (3. Slider Canopy) 2021-12-25
- 01/11/2021 - rear canopy attach blocks pt 2 - 1h30 (3. Slider Canopy) 2021-12-25
- 02/11/2021 - fine tuning slider rails - - 2h30 (3. Slider Canopy) 2021-12-26
- 04/11/2021 - slider track - 3h (3. Slider Canopy) 2021-12-27
- 06/11/21 - side skirts pilot side - 7h (3. Slider Canopy) 2021-12-28
- 13/11/2021 - Sideskirts brace - 7h30 (3. Slider Canopy) 2021-12-29
- 14/11/2021 - dimple countersink sideskirt - 2h (3. Slider Canopy) 2021-12-29
- 20/11/2021 - Working on passenger side skirt - 2h30 (3. Slider Canopy) 2021-12-30
- 21/11/2021 - passenger side skirt pt2 - 5h (3. Slider Canopy) 2022-01-02
- 22/11/2021 - Passenger side skirt Pt3 - 0h30 (3. Slider Canopy) 2022-01-02
- 23/11/2021 - Passenger side skirt Pt4 - 2h (3. Slider Canopy) 2022-01-02
- 25/11/2021 - Passenger side skirt Pt5 - 1h30 (3. Slider Canopy) 2022-01-02
- 26/11/2021 - some help drilling - 1h (3. Slider Canopy) 2022-01-02
- 27/11/2021 - Passenger side skirt Pt7 - 3h30 (3. Slider Canopy) 2022-01-04
-
2022
- 03/12/2021 - Rudder fairings installed - 2h (5. Fairings) 2022-01-05
- 08/01/2022 - Preparing for interior painting (3. Slider Canopy) 2022-08-29
- 22/01/2022 - Rivetting canopy to frame (3. Slider Canopy) 2022-08-29
- 29/01/2022 - Rivetting skirts (3. Slider Canopy) 2022-08-29
- 05/02/2022 - Starting rear skirts - 5h30 (3. Slider Canopy) 2022-08-30
- 12/02/2022 - modelling for rear skirt - 2h (3. Slider Canopy) 2022-08-30
- 20/02/2022 - working on wingtips reinforcement strip - 5h (6. Wing tips) 2022-08-30
- 24/02/2022 - drilling reinforcement right wing tip - 4h (6. Wing tips) 2022-08-30
- 26/02/2022 - rear skirt epoxy first 3 layers - 8h (3. Slider Canopy) 2022-08-30
- 05/03/2022 - Rear skirts 2nd layer of epoxy - 4h (3. Slider Canopy) 2022-08-30
- 24/03/2022 - applying micro on rearskirts - 3h30 (3. Slider Canopy) 2022-08-31
- 08/04/2022 - applying more micro on the rearskirt - 3h (3. Slider Canopy) 2022-08-31
- 09/04/2022 - Rear skirt cutting to shape - 3h (3. Slider Canopy) 2022-08-31
- 16/04/2022 - more sanding rear skirt and drilling holes - 2h (3. Slider Canopy) 2022-08-31
- 07/05/2022 - Drilling attach points rear skirts - 2h (3. Slider Canopy) 2022-08-31
- 26/05/2022 - countersinking wingtip and epoxy - 6h30 (6. Wing tips) 2022-08-31
- 28/05/2022 - Sikaflex rear skirt - 5h (3. Slider Canopy) 2022-09-01
- 18/06/2022 - Rivetting canopy to frame in rear skirt and epoxy - 3h (3. Slider Canopy) 2022-09-01
- 06/08/2022 - Landing gear started - 5h45 (4. Landing gear) 2022-09-01
- 13/08/2022 - U-810 cleaning and adapting - 2h (4. Landing gear) 2022-09-02
- 19/08/2022 - brake cylinder mating - 1h (4. Landing gear) 2022-09-02
- 27/08/2022 - parking brake mount - 4h (4. Landing gear) 2022-09-02
-
2023
- 07/09/2022 - parking brake line bending - 2h (4. Landing gear) 2023-05-31
- 17/09/2022 - ADAHRS bracket prep - 5h30 (1. Various Finishing) 2023-05-31
- 26/12/2022 - Refit right wheel tyre - 4h30 (4. Landing gear) 2023-05-31
- 28/12/2022 - Fitting wheels on gear legs - 4h (4. Landing gear) 2023-05-31
- 29/12/2022 - Fitting brakes on gear legs (cntd) - 4h (4. Landing gear) 2023-05-31
- 30/12/2022 - Install left wheel on gear - 4h (4. Landing gear) 2023-06-01
- 31/12/2022 - Drill right axle gear leg wheel nut - 4h (4. Landing gear) 2023-06-01
- 02/01/2023 - Drill axle and install ADAHRS bracket - 1h30 (4. Landing gear) 2023-06-01
- 03/01/2023 - Mount wheel and parking brake brachet - 2h (4. Landing gear) 2023-06-01
- 04/01/2023 - Landing gear clearence in firewall - 2h (4. Landing gear) 2023-06-01
- 07/01/2023 - parking brake elbows - 1h (4. Landing gear) 2023-06-01
- 15/01/2023 - Installing brake lines cabin side - 8h (4. Landing gear) 2023-06-01
- 21/01/2023 - Pedal extentions and inspection deck rivetting - 5h (9. Forward and Center fuselage) 2023-06-01
- 28/01/2023 - Rivetting skeleton forward fuselage - 4h (9. Forward and Center fuselage) 2023-06-01
- 04/03/2023 - Rivetting fwd top fuselage (cntd) - 1h30 (9. Forward and Center fuselage) 2023-06-01
- 26/03/2023 - Standing on her own legs ! - 3h30 (4. Landing gear) 2023-08-16
- 27/03/23 - FFW pilot side brake line - 2h (4. Landing gear) 2023-08-17
- 28/03/2023 - FFW Passenger side brake lines - 1h30 (4. Landing gear) 2023-08-17
- 31/03/2023 - Various tasks -1h (1. Various Finishing) 2023-08-17
- 12/07/2023 - Flap motor safety wiring SB - 4h (12. Systems) 2023-08-21
- 29/07/2023 - Front elevator pushrod drilling and fitting - 2h30 (8. Center Fuselage) 2023-09-20
-
2024
- 28/08/2023 - Inforcement bracket top fuselage rib - 3h (1. Various Finishing) 2024-08-21
- 30/08/2023 - wing tip ribs - 4h (4. Main Wings) 2024-08-21
- 29/10/2023 - Aileron Trim 1 - 5h30 (1. Various Finishing) 2024-09-03
- 30/10/2023 - Aileron Trim 2 - 2h (1. Various Finishing) 2024-09-03
- 01/11/2023 - Aileron trim 3 - 2h30 (1. Various Finishing) 2024-09-03
- 03/11/2023 - Elevator trim - 2h (1. Various Finishing) 2024-09-03
- 02/12/2023 - Aileron Trim 4 (1. Various Finishing) 2024-09-04
- 01/03/2024 - Empennage fairing 1 - 3h (5. Fairings) 2024-09-05
- 02/03/2024 - Empennage fairing 2 - 3h30 (5. Fairings) 2024-09-06
- 27/03/2024 - Empennage Fairing 3 - 4h (5. Fairings) 2024-09-30
- 05/04/2024 - Empennage Fairing 4 - 1h30 (5. Fairings) 2024-09-30
- 01/05/2024 - Empennage Fairing 5 - 6h (5. Fairings) 2024-10-02
- 10/05/2024 - Empennage Fairing 6 + taillight wiring - 6h (5. Fairings) 2024-10-02