18/01/26 - Panel picture with top skin - 0h Written on 04 February 2026. Posted in 5.1. Planning electrical / instruments. As I had the top skin clecoed on, this was a good moment to take another picture of the panel installation. The right side sub panel is still missing. Parent Category: 5. Instruments / Electrics Hits: 359 Previous article: 11/08/26 - Panel, Behind the scenes - 4h Prev Next article: 31/12/25 - Finalised static line routing and connections panel side - 5h Next