04/03/2023 - Rivetting fwd top fuselage (cntd) - 1h30

Some more rivetting on the forward fuselage skeleton. The six rivets below connect F902 with F7105B L and R. The outboard ones are quite easy but the ventilation box is quite annoying and you'll need an offset rivet set to put the gun on.

The inner ones are easier to shoot but more difficult to buck as the F902 flange is in the way.

A lot of words to say that these were some frustrating rivets.

 Back side pilot side.

Here are the rivets on the passenger side

 And the back of the passenger side.

 

Site Options

Legal Mumbo-Jumbo

It’s possible (not likely) that I’m not as smart as I think I am. (Occasionally, I have moments when I know this to be true. Fortunately, the feeling passes quickly.) Although I have tried to make this information as accurate as I can, it is not only possible, but also quite likely, that erroneous and misguided information lurks within these pages. I cannot and do not warrant these pages to be error free and correct. Furthermore, I accept no liability for the use of this (mis)information. And, as many would say, your mileage may vary. If, after reading this, you are intent on proceeding, please be aware that the contents of this site are protected by copyright (copyright © 2011 and 2012). Nonetheless, you may copy this material subject to these two conditions: (1) any information used is for non-commercial purposes, and (2) the source of the material is properly credited. Of course, you may link to any page herein. At some articles, snippets of the plans from Vans are visible. These are for educational and illustrations purposes only and should never be used as plans for part construction or assembly as plans may have changed since the picture was taken and more important they are protected by Copyright by the Vans Aircraft Mothership company.