25/04/2020 - rivetting left wing bottom skin final - 5h Written on 18 August 2020. Posted in 2.8. Closing skins. At last, the final rivets have gone in the bottom skins. Left wing is now complete. Ready to move to the right wing bottom skin. Parent Category: 2. Wing Hits: 754 Previous article: 23/04/2020 - left wind outer skin rivetting (cntd) - 3h Prev Next article: 28/04/2020 - flap brace rivetting and pitot mast - Next