14/09/2020 - Finish drill roll bar - 3h Written on 07 February 2021. Posted in 4.3. Slider Canopy. Finalised drilling pilot side of the roll bar using the same technique with the drill hole duplicator. Double checking the 7/32 spacing between the side of the F-721B-L canopy deck and the WD-641 roll bar. Parent Category: 4. Finishing Kit Hits: 819 Previous article: 15/09/2020 - Cut and drill rails - 2h Prev Next article: 05/09/2020 - Making spacers for roll bar and drill rollbar - 5h Next