22/04/2017 - rivetting cntd 3 - 4h

Another rivetting session on the forward fuselage.

This time we knocked in the rest of the F705, baggage bulkheads F-722 and F-724s an both sides and most of the joint of aft and center fuselage.

Cindy in action with the 3x gun. She's getting good at timing which makes things a lot easier.

 The joint of the forward and aft fuselage are really nice and thight.

 view of the belly. Also here very nice joint.


Site Options

Legal Mumbo-Jumbo

It’s possible (not likely) that I’m not as smart as I think I am. (Occasionally, I have moments when I know this to be true. Fortunately, the feeling passes quickly.) Although I have tried to make this information as accurate as I can, it is not only possible, but also quite likely, that erroneous and misguided information lurks within these pages. I cannot and do not warrant these pages to be error free and correct. Furthermore, I accept no liability for the use of this (mis)information. And, as many would say, your mileage may vary. If, after reading this, you are intent on proceeding, please be aware that the contents of this site are protected by copyright (copyright © 2011 and 2012). Nonetheless, you may copy this material subject to these two conditions: (1) any information used is for non-commercial purposes, and (2) the source of the material is properly credited. Of course, you may link to any page herein. At some articles, snippets of the plans from Vans are visible. These are for educational and illustrations purposes only and should never be used as plans for part construction or assembly as plans may have changed since the picture was taken and more important they are protected by Copyright by the Vans Aircraft Mothership company.