04/05/20020 - Right wing closing 1 - 3h

Started rivetting the inner part of the right wing skin. I won't repeat the details as the process is the same as on the left wing.

Work in L-shape. The part under the wing walk doubler is the hardest. But by now, I got the hang of it and it went a bit smoother as on the left one.

I won't be posting many pictures and focus on the work to speed up work a bit.

I'm working in short 3 hour sessions and doing a bit at a time.


Site Options

Legal Mumbo-Jumbo

It’s possible (not likely) that I’m not as smart as I think I am. (Occasionally, I have moments when I know this to be true. Fortunately, the feeling passes quickly.) Although I have tried to make this information as accurate as I can, it is not only possible, but also quite likely, that erroneous and misguided information lurks within these pages. I cannot and do not warrant these pages to be error free and correct. Furthermore, I accept no liability for the use of this (mis)information. And, as many would say, your mileage may vary. If, after reading this, you are intent on proceeding, please be aware that the contents of this site are protected by copyright (copyright © 2011 and 2012). Nonetheless, you may copy this material subject to these two conditions: (1) any information used is for non-commercial purposes, and (2) the source of the material is properly credited. Of course, you may link to any page herein. At some articles, snippets of the plans from Vans are visible. These are for educational and illustrations purposes only and should never be used as plans for part construction or assembly as plans may have changed since the picture was taken and more important they are protected by Copyright by the Vans Aircraft Mothership company.